Opening a Restaurant: The Complete Checklist — From the Property to the First Guest

Opening a restaurant is a marathon with many stages — and the most important decision is made right at the start: the property. This checklist guides you step by step from selecting the property, through permits and budget, to the opening.

Opening a restaurant in a professional commercial kitchen (AI-generated symbolic image)
Image: AI-generated

Step 1: The Right Property — Deciding Factor

Rent and location can hardly be adjusted later. Check every point on this list before signing — if in doubt, with a specialist planner:

Criteria What to Watch Out For
Previous Use Was there already a restaurant on the premises? Then usually extraction, grease separator and the building-use designation exist — saving five-figure renovation costs.
Change of Use If previously non-gastronomic use, a building-use change (building authority) is necessary — duration and outcome must be clarified BEFORE contract signing.
Extraction/Ventilation A full kitchen needs a powerful extraction system over the roof. Retrofitting in old buildings is expensive and not always approvable.
Grease Separator Mandatory for kitchen wastewater (DIN 4040-100). Present? Condition? Include retrofit costs in the plan.
Electricity & Gas Full kitchens require three-phase power (400 V) with sufficient connection capacity — have main connection checked.
Area & Layout Rule of thumb: kitchen, storage, refrigeration and staff need about one third of the space. Consider guest area, WCs (barrier-free!), and deliveries.
Location & Concept Fit Walk-in customers or destination gastronomy? Parking, outdoor area, local competition, rent escalation, and contract term.

Step 2: Authorities, Permits & the Right Experts

No other step involves as much bureaucracy — but with the right order and partners, everything is doable. First, an overview of authorities:

Authority Responsible For When
Building Authority Change of use and conversion (application via architect), parking space verification, fire protection, special permits for outdoor dining first — longest processing time
Trade Office Business registration (approx. €20–60) before opening
Licensing Authority (Public Order Office) Liquor license/concession — with certificate of good conduct, extract from business central register, Chamber of Commerce hospitality training, lease, and floor plan allow 4–8 weeks
Health Department Instruction according to § 43 Infection Protection Act — for you and every team member BEFORE the first working day bookable short-term
Food Monitoring Business registration; later controls unannounced — keep HACCP documentation ready from day 1 before opening
Tax Office Tax registration; a TSE-certified cash register is mandatory before opening
BGN Trade Association Mandatory business registration within 1 week after founding
Automatic Processes Chamber of Commerce membership, GEMA (music rights), broadcasting fees; plus insurance: liability, inventory, business interruption ongoing

Who Helps With What — The Experts

  • Architect or Civil Engineer (authorized to submit building plans): Mandatory once a change of use or permit-requiring conversion is planned — submits building application and handles fire protection, parking, accessibility and mandatory WC numbers. Find via your federal state’s architects’ chamber; look for gastronomy references.
  • Kitchen Planner: designs layout, material flows (HACCP-compliant: separating clean and dirty), connection loads and ventilation. We offer this: our free commercial kitchen planning provides measurement, layout, appliance selection and quote all in one.
  • Specialist Trades: electrician (400 V connections with acceptance inspection), plumber (grease separator according to DIN 4040-100), ventilation specialist, gas fitter with inspection for gas appliances.
  • Tax Advisor with gastronomy experience — cash register management is the sector’s most frequent audit topic.
  • Founding Advice & Financing: Chamber of Commerce founding advice (free) and DEHOGA regional association; financing via house bank, e.g. with KfW start-up loan — for that you need a business plan.

Where Do I Get What?

What Where From
Kitchen, refrigeration and dishwashing technology, stainless steel furniture From us — including specialist advice and planning, so the appliances fit your menu and space
Dining room furniture & interior Fit-out specialist or carpenter — enquire early, delivery times of 6–12 weeks normal
Small inventory (dishes, cutlery, pots) Gastronomy suppliers; pots, pans & helpers also in our kitchen accessories
Cash register system TSE-certified cash register provider — have approved by tax advisor
Buy used? Where it pays off and where not: New vs. Used

Step 3: Plan Budget Realistically

Rough benchmarks for a restaurant with 60–100 seats — highly dependent on condition and region; we gladly prepare a quote for your detailed planning:

Item Benchmark
Deposit, broker, first rents 3–6 months’ rent
Renovation & technology (extraction, electrical, plumbing) very property-dependent — from five-figure amounts upwards
Kitchen technology & refrigeration from approx. €30,000–80,000 net
Dining room furnishings from approx. €15,000–50,000 net
Small inventory, dishes, cutlery from approx. €5,000 net
Liquidity reserve at least 3 months fixed costs

Step 4: Equip Kitchen

The basic equipment of a restaurant kitchen, sensibly planned by stations:

In-depth: Setting Up a Commercial Kitchen — The Complete Guide

Step 5: Timeline to Opening

  1. Concept & business plan (including financing)
  2. Secure property — subject to permits
  3. Start official procedures in parallel (change of use first!)
  4. Kitchen planning & equipment order (allow 2–6 weeks delivery)
  5. Hire & train staff, finalise menu
  6. Trial run with friends/family & soft opening before official opening

Frequently Asked Questions

How long does a restaurant opening realistically take?

From signed lease to opening mostly 3–6 months — with change of use or major renovation, significantly longer.

Used or new equipment?

For refrigeration and dishwashers, energy consumption, warranty and hygiene usually argue for new equipment. Our detailed assessment: New vs. Used.

What is most often underestimated?

Extraction, grease separator and connection capacity — the three most expensive surprises for properties without previous gastronomic use.

Do I need an architect to open a restaurant?

Only if a building-use change or a permit-requiring renovation is planned — then a building plan authorized architect or civil engineer is mandatory (referral via architects’ chamber). For a taken-over gastronomic space without renovation usually the kitchen planning suffices.

Proven Equipment for the Restaurant

We Furnish Your Entire Operation

From the first sketch to a ready-to-use kitchen: We plan your equipment, deliver the appliances and advise you personally — also on budget and schedule.

Discover Cooking Technology →

Free Planning Consultation · Contact Us

Related Guides

Share this guide:

Last updated on 6 August 2026.

Cancel contract
Opening a Restaurant: The Complete Checklist — From the Property to the First Guest | Gastro-Nik